Главная > Пресс-центр > Mass media about the project > Website www.inform.kz. Traffic on Western Europe – Western China road was blocked due to threat of washing out of road
СМИ о проекте
Версия для печатиВерсия для печати
03/28/2017 
Website www.inform.kz. Traffic on Western Europe – Western China road was blocked due to threat of washing out of road

 "On 515 kilometer of the Western Europe-Western China road (the bypass road near the city of Taraz), on 27 March, due to increase in the volume of the Asa river, the riverbank was washed away," the press service of the government department explained. - As a result, a threat of a road washout was created. For prevention the work on strengthening the river bank was carried out, a 600 m long dam with height of 1.5 m and width of 3 m was poured, 60 m of the roadside verge were filled. At the moment, the threat of road washout is removed".

More than 80 employees of Akimat of Zhambyl district and region, branch of RSE Kazavtodor, police officers, task force, SE “OSO” and SE “SPiASR” of Emergency department of Zhambyl region, headed by Bagdat Danilov, Colonel of emergency Department, took part in bank protection works. 25 pieces of equipment were involved.

For safe work, traffic was blocked at the section of the Western Europe-Western China road km 510-521. Movement of transport is carried out on the old bypass road.

In addition, on the territory of the dacha massif "Dorozhnik" in Zhambyl district, Karatobe rural district, water overflow of road leading to the dacha occured because of the increase in the volume of the river Asa up to 70 cubic/sec. 

"The length of the overflow was 20 m, the height - 10 - 15 cm. There are no threats to the population and houses. To reduce water in the river, the discharge from the Ters-Aschibulak reservoir was reduced by 10 cubic/sec. The task force of the Emergency Situations department and the Emergency Situations Board of the Taraz city went to the place" explained in the Emergency Department of the region.

The emergency department of the Zhambyl region announced a storm warning due to the high snow cover and continuing rainfall in the Talas Alatau Mountains and the Ugam Ridge. These days, there is a danger of avalanches, and it is not recommended to reach the steep snow-covered slopes because of the possible provocation of avalanches.

 

 

 

 

«Важное значение имеет завершение строительства казахстанского участка международного автомобильного коридора «Западная Европа - Западный Китай». Это действительно народная стройка века».
«Мы ставили задачу развивать инфраструктуру. И это оказалось нам по силам. В настоящее время мы возрождаем Новый Шелковый путь. Мы открыли доступ к странам Персидского залива и Большого Востока. Мы распахнули восточные ворота, проложив путь на рынки Китая и всего Азиатского континента». «Стратегия «Казахстан-2050».
 
 
Послание Первого Президента РК - Елбасы, 2012 г.

 

 

 

 

«Исполнительной власти нужна полная, качественная программа «Нурлы Жол». Это стратегический проект, благодаря которой будет затронута вся транспортная инфраструктура».

 

 

 

 

Стратегия 2050

 

 

 

 

Проекты "ЗЕ-ЗК"
Проекты "Нурлы жол"
Закупки
Объявления
Пресс-центр
Мультимедиа
Вопросы и ответы Контакты